CURRICULUM VITAE


N A M E : Ir. NOVIANTO BOEDISASETYO
NATIONALITY : INDONESIA
PRESENT ADDRESS : TAWANG SARI PERMAI A/102 TAMAN – SIDOARJO
TELEPHONE : 031 – 7881236
MOBILE : +62 081- 319 539 021 ; +62 0888 12 22 805
E-MAIL : www.noviantobs@yahoo.co.id
DATE OF BIRTH/PLACE : NOVEMBER 27TH, 1955 / SURABAYA
MARITAL STATUS : MARRIED SINCE 1979
EDUCTION :
• Elementary School : 1962 – 1968 , Surabaya – Indonesia
• Junior High School : 1969 – 1971 , Surabaya – Indonesia
• Senior High School : 1972 – 1974 , Surabaya – Indonesia
• High Technical School : 1979 – 1982 , Diploming III Institute Technology of 10 November Surabaya – Indonesia
1983 – 1986 , Engineer Institute Technology Adhi Tama Surabaya Indonesia

TRAINING EXPERIENCE :
• 1983, Training AC, DC and Submerged ARC Welding, Japan (Certificate).
• 1983, Training NDT Non Radiation Level I in Industrial Department Bandung, Indonesia (Certificate)
• 1984, Training Guarantee Engineer, Japan (Certificate)
• 1988, Training NDT Non Radiation Level II from US NAVY GUAM AMERICAN (Certificate)
• 1989, Training NDT Non Radiation Level II in B4T Bandung, Indonesia (Certificate)
• 1993, Training Calibration Equipment at Metrology LIPI Department (Certificate)
• 1994, Seminar Non Destructive Testing Technique and Technology Overview Tawadagraha (Certificate)
• 1999, Training NDT Non Radiation Level III in BATAN-IAEA (Certificate)
• 1999, Re-Certification NDT Non Radiation Level II ASNT (Certificate)
• 2000, Training Non Radiation Level III ASNT (Setsco-Singapore)
• 2006, Training Sea Survival (Certificate)


PROFESSIONAL EXPERIENCE :
2008 – Present, PT.ALFA TRANS RAYA

Position : OWNER SURVEYOR FOR LCT 1500 DWT

2007 – 2008, PT.SAMUDRA MARINE INDONESIA (BOJONEGARA-CILEGON)

Position : ASS. SUPERVISOR



Responsibilities :
• Ensuring that quality procedure such as Inspection and NDT (non radiation and radiation), Project NDT Map and QA manual are required have been .
• Ensuring that quality procedure such as Inspection and Test Plan (ITP), Project Quality Plan and QA manual are required have been specially in electrical and instrument developed for review and approval by customer before Commencement of manufacturing.
• Keep quality documentation in controlled Condition.
• Compilation of quality records in accordance with final documentation requirements.
• Preparation of conduct electrical procedure for precommissiong test


2000 – 2007, PT. PAL INDONESIA
Position : Head of NDT Section
Responsibilities :
• Ensuring that quality procedure such as Inspection and NDT (non radiation and radiation), Project NDT Map and QA manual are required have been .
• Ensuring that quality procedure such as Inspection and Test Plan (ITP), Project Quality Plan and QA manual are required have been specially in electrical and instrument developed for review and approval by customer before Commencement of manufacturing.
• Coordinating periodical Internal audit as required in ISO – 9000 Standard.
• Keep quality documentation in controlled Condition.
• Compilation of quality records in accordance with final documentation requirements.
• Preperation and coordination with third party including (negotiation priceing) to handle project according to customer has been approved.
• Report to quality Assurance Manager.

2005 - 2006 , PT.PAL – PT.RAGA PERKASA EKAGUNA CONSORTIUM

Project : EPCI of an offshore Wellhead Platform and WetGas Subsea
Pipeline – Amerada Hess ( Indonesia – Pangkah ) Limited.
Position : QA/QC Inspector
Responsibilities :
• Preparation of conduct electrical procedure for precommissiong test
• Preparation of conduct NDT Map.
• Organize in developing, implementing and monitoring a quality management system in accordance with ISO – 9000 Standard and / or another code.
• Keep quality documentation in controlled Condition.
• Compilation of quality records in accordance with final Manufacture Data Record (MDR) requirements.
• Report to quality Assurance Manager.


2004 - 2006 , PT.PAL – PT.DEN CONSORTIUM

Project : Tanjung Priok Power Plan.
Position : QA/QC Inspector
Responsibilities :
• Preparation of joint operation procedures from PAL and DEN ( Dinamika Engineering Nusantara ) existing procedures, amended to suit operational methods and quality system objectives.
• Meger and continuity test for electric equipment.
• Individual test for all electric pump.
• Interlock system test..
• Load synchrone for paralel Jawa Bali.

2003 - 2004 , PT.PAL – PT.KDD CONSORTIUM

Project : Pupuk Iskandar Muda Power Plan in North Sumatra.
Position : QA/QC Inspector
Responsibilities :
• Quality Assurance Engineer of Electrical & Instrument for Power Plant Project

2002 , PT.PAL – PJB Gresik CONSORTIUM

Project : Sicanang Belawan Power Plan in North Sumatra.
Position : QA/QC Inspector
Responsibilities :
• NDT Inspection for all weld, upper casing, blade turbine and as turbine

2002 , PT.TITIS SAMPURNA

Project : Paiton Power Plan.
Position : Inspector
Responsibilities :
• Inspection and test by Ultrasonic for blade and casing..

1997 - 1999 , PT.PAL – INDONESIA

Project : Barge Mounted Gas Turbine Power Plan (1x30-40 MW) in Banjarmasin
Position : QA/QC Inspector
Responsibilities :
• Preparation of conduct electrical procedure for precommissiong test
• Meger and continuity test for electric equipment.
• Individual test for all electric pump.
• Interlock system test..
• Load synchrone for parallel Kalimantan.

1996 - 1997 , PT.PAL – INDONESIA

Project : Stator Frame
Position : QA/QC Inspector
Responsibilities :
• Coordinator of NDT Inspector for Non-Radiation at QA Department of PT.PAL


1995 - 1996 , PT.PAL – INDONESIA

Project : Receiving Material.
Position : QA/QC Inspector
Responsibilities :
• Review and check incoming material accordance with Request Order

1993 - 1995 , PT.PAL – PT. BKI CONSORTIUM

Project : LNG PT. BADAK BONTANG KALTIM
Position : QA/QC Inspector
Responsibilities :
• Inspector NDT Level II ( Ultrasonic Test )
• Visual check for all welding after repair.
• Review and check welding record by NDT Non Radiation.
• Visual check for all equipment

1992 - 1993 , ARBNI -ARCO

Project : LNG PAGERUNGAN ISLAND PROJECT
Position : QA/QC Inspector
Responsibilities :
• Inspector UT-ASTN Level II

1988 - 1992 , PT. PAL INDONESIA

Project : PT. PAL
Position : QA/QC Inspector
Responsibilities :
• Inspector UT-ASTN Level II ( Ultrasonic Test ) at QA Department

1983 - 1987 , PT. PAL INDONESIA

Project : PT. PAL
Position : QA/QC Inspector
Responsibilities :
• Inspector UT-ASTN Level I ( Ultrasonic Test ) at QA Department

1982 - 1983 , PT. PAL INDONESIA

Project : PT. PAL
Position : QA/QC Inspector
Responsibilities :
• Staff Quality Assurance Department with responsibility to Investigation and give approval of Acceptance Test for Electrical.

0 komentar:

Posting Komentar